Central Library Building Assessment – please review

It’s very important to take a close look at what is being said about the Central Library building! The RPL is planning consultations about new designs in March and people should be well-informed and prepared for these consultations.  The RPL Board continues to say that the building is old and needs to be replaced. Please forward thoughts or comments you have to FRPL.

The Building Assessment about the condition of Central Library building
that FRPL has been requesting for a while has finally been made available on the RPL website http://www.reginalibrary.ca/cld/?q=node/22 and is also available here. Building%20Assessment%20Summary%20-%20201206

This document has some critical statements about the condition of the building and the potential for adaptive re-use.

“This report was originally prepared in 2009 and has been updated to
reflect the master Program prepared by Resource Planning Group. The
report consists of a facility analysis by P3A as Architects, JC Kenyon
Engineering- Structural, MacPherson Engineering- Mechanical, Ritenburg
and Associates- Electrical, Resource Planning Group- Library Programming
and Functionality. The report reflects the requirements of the Regina
Public Library from a technical and functional perspective and reviews
issues related to building re-use.”

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s